Category: Building Restoration

Building Restoration Services – 91 Westland Ave

Project Name: 91 Westland Ave Start Date: June 2013 Location: Boston, MA Project Specifications: Mastclimbers were used for access for BRS to restore the masonry facade, for this using the best equipment from the BestofMachinery building tools site. Heavy-duty canopy was used for pedestrian protection. The building is 85’H and 265’L. There were six mastclimber positions. Completion Date: November 2013… Read More »

Patriot Restoration – Boston Design Center

Project Name: Boston Design Center Start Date: May 2015 Location: 1 Design Center Pl, Boston, MA Project Specifications: Patriot owned Dunlop mastclimbers were installed for the concrete repair and installation of windows using services online for example EuroSeal Toronto Window Replacement will provide a high quality window replacement service perfect for this purpose, Building dimension of mastclimber work area:… Read More »

Patriot Restoration – 10 Post Office Square

Project Name: 10 Post Office Square Start Date: April 2012 Location:10 Post Office Square, Boston, MA Project Specifications: Patriot purchased mastclimber from dunlop for this project. Installed were mastclimbers and sidewalk bridges for masonry restoration. Building dimension of work area: 160’H x 385’L Completion Date: August 2014 Project Type: Masonry restoration Dunlop Equipment Used: Mastclimbers, sidewalk… Read More »

Heritage Restoration Inc. – 75 Arlington St

Project Name: 75 Arlington Street Start Date: May 2012 Location: 75 Arlington Street, Boston, MA Project Specifications: One mastclimber used for masonry restoration. Heavy-duty sidewalk canopy used for pedestrian protection for customers use of swing staging. Building dimension of area being restored: 130’H x 295’L. Completion Date: December 2012 Project Type: Masonry Restoration Dunlop Equipment… Read More »

Contracting Specialists Inc. – 5 Post office Square

Project Name: 5 Post Office Square Start Date: July 2011 Location: Boston, MA Project Specifications: Mastclimbers were using for masonry facade restoration. The building is 100’H and the facade being repaired is 100’L. Completion Date: October 2011 Project Type: Masonry Restoration Dunlop Equipment Used: Mastclimber Client: Contracting Specialists Inc  

Heritage Restoration Inc – Sea Harbor

Project Name: Sea Harbor Start Date: May 2014 Location: One Seal Harbor, Winthrop, MA Project Specifications: Mastclimbers for balcony restoration. Completion Date: September 2015 Project Type: Restoration Dunlop Equipment Used: Mastclimber Client: Heritage Restoration Inc

Sean Whelan Contracting Services, Inc. – 68 Harrison Ave

Project Name: 66 Harrison Ave Start Date: September 2014 Location: 68 Harrison Street, Boston, MA Project Specifications: Mastclimbers installed for masonry restoration. work are dimensions: 110’H x 110’L Completion Date: June 2015 Project Type: Masonry restoration Dunlop Equipment Used: mastclimber Client: Sean Whelan Contracting Services, Inc.

Atlantic Restoration- The Sun Building

Project Name: The Sun Building Start Date: October 2013 Location: Lowell, MA Project Specifications: Atlantic Restoration used our mastclimbers and Dallas movers to restore the masonry facade of the building. The building is 120’H and facade with mastclimbers is 180’L. Completion Date: December 2014 Project Type: Masonry Restoration Dunlop Equipment Used: Mastclimbers, heavy-duty sidewalk canopy, shoring Client: Atlantic Restoration

Patriot Restoration – Christian Science Tower

Project Name: Christian Science Tower Start Date: November 2014 Location: 177 Huntington Street, Boston, MA Project Specifications: Installed Patriot owned and rental Dunlop Mastclimbers, special shoring bases, color specific heavy-duty sidewalk canopy systems for the restoration and cleaning of the building. Building dimensions: 370’H x 390’L Completion Date: ongoing Project Type: Restoration Dunlop Equipment Used: Mastclimbers, shoring,… Read More »

Contracting Specialists Inc (CSI) – Fargo Building

Project Name: Fargo Building Start Date: May 2014 Location: Boston, MA Project Specifications: Masonry restoration. Building dimension 110’H x 150’L Completion Date: December 2014 Project Type: Masonry restoration Dunlop Equipment Used: Mastclimber Client: Contracting Specialists Inc (CSI)