Project Name: Hanover Pier 4
Start Date: December 2014
Location: Boston, MA
Project Specifications: Mastclimber, special bridge system. The building is 210’H with one 52’L position needed. The project was panel installation.
Completion Date: January 2015
Project Type:Panel Installation
Dunlop Equipment Used: Mastclimber, special bridge system
Client: Cheviot Corporation